A
ALTIUS CMFacade · Roofing · Construction Mgmt
FISP Requirements

What Local Law 11 actually requires

Local Law 11 created FISP — the Facade Inspection and Safety Program. Every building taller than six stories must have a Qualified Exterior Wall Inspector (QEWI) examine the exterior walls and appurtenances every five years and file a report with NYC DOB. The current inspection window, Cycle 10, runs February 2025 through February 2030 in three staggered sub-cycles.

SAFE

No repair or maintenance needed; none expected within the next five years.

SWARMP

Safe now, but needs repair or maintenance within the next five years to stay that way.

UNSAFE

Hazardous condition: immediate public protection, and correction within 90 days of filing unless DOB grants an extension. Emergency steps →

Not sure which FISP Cycle 10 sub-cycle your building is in?Read the full Cycle 10 filing guide.

Altius CM supports the architects and engineers who conduct FISP inspections; the licensed professional (QEWI) signs and files the report. Haven't had your FISP inspection yet? A QEWI has to file the report before any repair work can be scoped — FlatRateFISPoffers flat-rate NYC facade inspections with instant online pricing.

Documented Work

Facade restoration projects, with real numbers

Every figure below comes from our own project records — self-reported, not third-party audited, but specific.

Facade Restoration at 1 Rector Park / 333 Rector Place, Manhattan, NY 10280
FACADE RESTORATION

1 Rector Park / 333 Rector Place

Manhattan, NY 10280

Facade Restoration at 1166 Fox Street, Bronx, NY 10459
FACADE RESTORATION

1166 Fox Street

Bronx, NY 10459

▸ 10,000 Sq Ft of EIFS

Facade Restoration at 150 West 56th Street, Manhattan, NY 10019
FACADE RESTORATION

150 West 56th Street

Manhattan, NY 10019

Roofing & Facade Restoration at 167-169 Lorimer Street, Brooklyn, NY 11206
ROOFING & FACADE RESTORATION

167-169 Lorimer Street

Brooklyn, NY 11206

▸ 2,000 Sq Ft of Roof Recovery

▸ 1,500 Sq Ft of Brick Replacement

Roof and Facade at 3178 Villa Avenue, Bronx, NY 10468
ROOF AND FACADE

3178 Villa Avenue

Bronx, NY 10468

▸ 1,000 Sq Ft of Brick Replacement

▸ 1,500 Sq Ft of Roofing Replacement

Facade Restoration at 3935 Blackstone Avenue, Bronx, NY 10471
FACADE RESTORATION

3935 Blackstone Avenue

Bronx, NY 10471

▸ 24 Suspended Scaffolds

▸ 20,000 LF of Sealant/Caulk Replacement

Facade Restoration at 45 Crosby Street, Manhattan, NY
FACADE RESTORATION

45 Crosby Street

Manhattan, NY

Facade Restoration at 48 Bleecker Street, Brooklyn, NY 11221
FACADE RESTORATION

48 Bleecker Street

Brooklyn, NY 11221

▸ 4 Suspended Scaffolds Simultaneously Operating

Roofing & Facade Restoration at 5 East 22nd Street, New York, NY 10010
ROOFING & FACADE RESTORATION

5 East 22nd Street

New York, NY 10010

▸ 30 Suspended Scaffolds

▸ 30,000 LF of Sealant/Caulk Replacement

Facade Restoration at 529 West 42nd Street, Manhattan, NY 10036
FACADE RESTORATION

529 West 42nd Street

Manhattan, NY 10036

Facade Design & Implementation at 870 New York Avenue, Brooklyn, NY 11203
FACADE DESIGN & IMPLEMENTATION

870 New York Avenue

Brooklyn, NY 11203

▸ 10,000 Sq Ft of EIFS

▸ 3,000 Sq Ft of Roofing/Balcony Waterproofing New Construction Roofing

Facade Restoration at Kips Bay Complex, New York, NY
FACADE RESTORATION

Kips Bay Complex

New York, NY

▸ 48 Suspended Scaffolds Simultaneously Operating

▸ 144 Suspended Scaffolds Total

Facade Restoration at Peter Cooper Village, New York, NY
FACADE RESTORATION

Peter Cooper Village

New York, NY

▸ 168 Suspended Scaffolds Simultaneously Operating.

▸ 546 Suspended Scaffolds Total

FAQ

Local Law 11 questions, answered directly

What is Local Law 11 and does it apply to my building?

Local Law 11 is the NYC law that created FISP, the Facade Inspection and Safety Program. It requires owners of buildings taller than six stories to have a Qualified Exterior Wall Inspector examine the exterior walls every five years and file a report with the NYC Department of Buildings. Building height, not building type, determines whether it applies.

What happens if my Local Law 11 inspection comes back Unsafe or SWARMP?

An Unsafe finding requires public protection (typically a sidewalk shed) installed immediately and repairs completed within 90 days of filing, unless DOB grants an extension. A SWARMP finding gives up to five years to complete the identified repair or maintenance program before the next cycle, but an uncorrected SWARMP condition becomes Unsafe by default at the next inspection.

How much facade restoration work has Altius CM actually completed?

Altius CM has documented facade restoration on 13 NYC projects, completed and in progress, ranging from single-building jobs to large multi-structure complexes like Kips Bay Complex (8 structures) and Peter Cooper Village (21 structures), deploying 690+ suspended scaffolds across those projects.

What's the difference between facade repair and facade replacement?

Facade repair addresses specific damaged areas — spalling brick, failed sealant, deteriorated lintels or shelf angles — while facade replacement removes and rebuilds larger sections of the exterior wall system. Most Local Law 11-driven restoration work is repair-scale; full replacement is reserved for facades where the underlying structure has failed.

SWARMP or Unsafe finding? Don't let the clock run out.

Contact Altius CM

Facade coming apart now? Emergency structural repair and containment →